Unrecorded Buried Chamber: Implications for Construction Alignment

Design for new stormwater hits reality when steel bulk water main found directly in scope.

Found a buried chamber/MH right in cut alignment which is not shown on records.

Scanned area with an Impulse Radar Raptor45 Array GPR to check EMF locate. Picked out redundant telephony cables and ducts crossing the scope of works that could not found via EMF locating.

As per GIS records…


Posted

in

, ,

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *